New Major Road Project Completed in Newcastle

Electrical featured image

Project KenKar Plastics was recently awarded the supply, welding, spacing and strapping of Polyethylene Conduits by an experienced Directional Drilling for Ausgrid as part of a major road project in Newcastle. The conduit as part of Ausgrid’s Specification had to be spaced 70mm apart to not adversely affect the thermal rating of the power cables. […]

WSAGA 1000mm

Project Forming critical infrastructure as part of the Western Sydney Airport’s construction at Badgery’s Creek, a new water main around the airport was to be constructed that included a creek crossing through unstable ground.  To combat the ground condition Sydney Water proposed to undertake Horizontal Directional Drilling (HDD) to install a 750m section of 1000mm […]

Barangaroo Cooling Water Project

Barangaroo Cooling Water Project

Project In the early 2000’s work commenced on the transformation of the disused container terminal on the Western Harbour into a cultural and civic hub called Barangaroo.  This once-in-a-lifetime transformation involved the construction of environmentally friendly public, residential and commercial spaces. The construction required a cooling system that included complex discharge lines and manifolds for […]

Mardi Dam 1200mm SDR11 PN16 HDPE Pipeline

Project Located within the Wyong Shire Council region on the Central Coast of NSW, the Mardi Dam project involved the installation of 1200mm SDR11 PN16 HDPE Pipe using Horizontal Directional Drill (HDD) under the Wyong Creek Crossing as part of the Mardi to Mangrove Link project. Solution With difficult ground conditions (alluvial clay, sand, gravel […]