Case Studies

Screenshot 2026-09-18 at 11.55.19 am

Large-bore EF branch saddles

Adding a full-bore branch to a large-diameter PE main is no standard tapping job. KenKar supplied, fabricated and installed EF branch saddles from 250 x 160 up to 800 x 400 — scraped, clamped, fused and pressure-tested before the main was cut.

View Case Study
IMG_0349

KenKar’s Quality Assurance System

Driven by a commitment to delivering high-quality solutions and workmanship, KenKar sought a smarter, more efficient way to capture and monitor welding data. Manual data recording methods proved slow, error-prone, and delayed both quality control and reporting. To address this, a real-time system was needed—one that could be used across multiple polyethylene welding and installation projects.

View Case Study
Electrical featured image

New Major Road Project Completed in Newcastle

Project KenKar Plastics was recently awarded the supply, welding, spacing and strapping of Polyethylene Conduits by an experienced Directional Drilling for Ausgrid as part of …

View Case Study
Ed welding on site

WSAGA 1000mm

Project Forming critical infrastructure as part of the Western Sydney Airport’s construction at Badgery’s Creek, a new water main around the airport was to be …

View Case Study
Moorebank Logistics

Moorebank Logistics Park

Project The development of the Moorebank Logistics Park will develop the current area into Australia’s largest freight infrastructure project.  Transforming the way containerised freight will …

View Case Study
Barangaroo Cooling Water Project

Barangaroo Cooling Water Project

Project In the early 2000’s work commenced on the transformation of the disused container terminal on the Western Harbour into a cultural and civic hub …

View Case Study
KenKar Mardi Dam 1 001-min

Mardi Dam 1200mm SDR11 PN16 HDPE Pipeline

Project Located within the Wyong Shire Council region on the Central Coast of NSW, the Mardi Dam project involved the installation of 1200mm SDR11 PN16 …

View Case Study