Case Studies
Large-bore EF branch saddles
Adding a full-bore branch to a large-diameter PE main is no standard tapping job. KenKar supplied, fabricated and installed EF branch saddles from 250 x 160 up to 800 x 400 — scraped, clamped, fused and pressure-tested before the main was cut.
KenKar’s Quality Assurance System
Driven by a commitment to delivering high-quality solutions and workmanship, KenKar sought a smarter, more efficient way to capture and monitor welding data. Manual data recording methods proved slow, error-prone, and delayed both quality control and reporting. To address this, a real-time system was needed—one that could be used across multiple polyethylene welding and installation projects.
New Major Road Project Completed in Newcastle
Project KenKar Plastics was recently awarded the supply, welding, spacing and strapping of Polyethylene Conduits by an experienced Directional Drilling for Ausgrid as part of …
WSAGA 1000mm
Project Forming critical infrastructure as part of the Western Sydney Airport’s construction at Badgery’s Creek, a new water main around the airport was to be …
Moorebank Logistics Park
Project The development of the Moorebank Logistics Park will develop the current area into Australia’s largest freight infrastructure project. Transforming the way containerised freight will …
Barangaroo Cooling Water Project
Project In the early 2000’s work commenced on the transformation of the disused container terminal on the Western Harbour into a cultural and civic hub …
Mardi Dam 1200mm SDR11 PN16 HDPE Pipeline
Project Located within the Wyong Shire Council region on the Central Coast of NSW, the Mardi Dam project involved the installation of 1200mm SDR11 PN16 …
Products

Polyethylene Pipe

Marine Pile Sleeves and Caps

Spigot Fittings

Electrofusion Fittings

Backing Rings, Gaskets & Bolts

Branch & Tapping Saddles

Conduit Spacers
